Employing Flexible Solutions
Although the air optimiser sections and containers were more straightforward in terms of road transport, we needed flexible solutions, such as side loaders, to collect the high volume of containers from site and deliver them to port for their respective deadlines.
Upon arrival at Southampton Port in the UK, the oversize pieces were lifted from the trailers following our predetermined lifting instructions, which included using specific lifting points, set spreader beam widths, sling lengths and tandem lifts.
A Project Manager was on site throughout the process to ensure we were happy with the lifts and could implement changes. Later, this information would be fed back to our team in Melbourne to ensure the processes at both ends were consistent.